3.4 MW, NC

Year: 2022
Running Gear: 2 vertical shaft Francis turbines with synchronous generators
Scope: Replacement of control system, excitation, and governors

Click for more info and pictures.


1.4 MW, CA

Year: 2022
Running Gear: 1 horizontal shaft Francis turbine with synchronous generator
Scope: Replacement of control system

Click for more info and pictures.


3.3 MW, MA

Year: 2022
Running Gear: 3 Vertical shaft Francis turbines with synchronous generators
Scope: Replacement of control system, exciters, and HPUs

Click for more info and pictures.


1 MW, NC

Year: 2021
Running Gear: 2 Vertical shaft Francis turbines with synchronous generators
Scope: Replacement of control system, exciters, and HPUs

Click for more info and pictures.


1.5 MW, MA

Year: 2020
Running Gear: 3 Vertical shaft Francis turbines with synchronous generators
Scope: Replacement of control system, exciters, and canal gate controller

Click for more info and pictures.


4 MW, MA

Year: 2018
Running Gear: 2 Vertical shaft Francis turbines with synchronous generators
Scope: Replacement of control system and exciters

Click for more info and pictures.


600 kW, NY

Year: 2018
Running Gear: Three units: One vertical shaft Francis turbine with synchronous generator. One horizontal shaft turbine with synchronous generator. One horizontal shaft double-runner turbine with synchronous generator.
Scope: Replacement control system, switchgear, and HPU. Black start capability.

Click for more info and pictures.


1.6 MW, NY

Year: 2017
Running Gear: Vertical shaft Kaplan turbine with synchronous generator.
Scope: Replacement control system and exciter.

Click for more info and pictures.


455 kW, MA

Year: 2016
Running Gear: 3 units: Vertical shaft synchronous generator driven by a Francis turbine. Vertical shaft synchronous generator driven by a propeller turbine, and a vertical shaft induction generator driven through a flat belt by a Kaplan turbine.
Scope: Replacement control system, switchgear, excitation, wicket gate operators.

Click for more info and pictures.


1.2 MW, MN

Year: 2016
Running Gear: 3- generating units: Two vertical shaft synchronous generators, each driven by a 33-in Leffel B propeller turbine. One propeller driven induction generator.
Scope: Replacement of control system.

Click for more info and pictures.


600kW, NY

Year: 2015
Running Gear: 3- units: One Francis turbine with gearbox and synchronous generator, one Francis turbine with direct-connect synchronous generator, and one propeller turbine with gearbox and induction generator.
Scope: Replacement of control system.

Click for more info and pictures.


340kW, VT

Year: 2015
Running Gear: Two vertical shaft Kaplan turbines with belt driven induction generators. 
Scope: Control system for two new generating units at a historic mill site

Click for more info and pictures.


1.6 MW, NC

Year: 2014
Running Gear: Francis turbines and direct connect synchronous generators.  Unit 1 is 1000 kW, Unit 2 is 600 kW.
Scope: Replacement of control system, switchgear, and Woodward governors

This project is located in central NC, and was originally built in the...read more.

Click for more info and pictures.


500kW, CT

Year: 2014
Running Gear: Five 100kW prototype horizontal shaft Kaplan turbines with induction generators.
Scope: Control system for a new power plant at an existing dam.

Click for more info and pictures.


6.4 MW, Jamaica

Year: 2014
Running Gear: A single high-head Francis turbine and synchronous generator.
Scope: Replacement of existing control system

Click for more info and pictures.


1MW, NY

Year: 2014
Running Gear: Two 500 kW Francis turbines and direct connect synchronous generators.
Scope: Replacement of control system

Click for more info and pictures.


1.2 MW, VT

Year: 2013
Running Gear: A single 1220 kW Kaplan Turbine, and direct connect synchronous generator.
Scope: Control system for a new power plant at an existing dam

Click for more info and pictures.


650kW, MA

Year: 2013
Running Gear: Two Leffel Francis turbines and synchronous generators
Scope: Replacement of control system

Click for more info and pictures.


550kW, MN

Year: 2013
Running Gear: Horizontal shaft Leffel Francis turbine, with Marelli synchronous generator
Scope: Control system for a new, single unit power plant at an existing dam

Click for more info and pictures.


275kW, VA

Year: 2012
Running Gear: Two Francis turbines, one synchronous and one induction generator. Total capacity 275kW.
Scope: Complete design/build for one turbine/generator, controls and switchgear for two units, new automatic trash racks.

Click for more info and pictures.


550kW, NC

Year: 2011
Running Gear: A single 550kW Francis turbine and synchronous generator.
Scope: Replacement of the control system and switchgear.

Click for more info and pictures.


1.2 MW, Jamaica

Year: 2011         
Running Gear: A single high-head Francis turbine and synchronous generator, 1.2MW capacity.
Scope: Replacement of the existing control system

Click for more info and pictures.


280kW MA

Year: 2011
Running Gear: Two propeller turbines, gearboxes, and 1800 RPM synchronous generators. Total installed capacity of 280 kW.
Scope: Replacement of controls

Click for more info and pictures.


10kW, OH

Year: 2010
Running Gear: One Francis turbine with 10 kW induction generator.
Scope: Controls, switchgear, utility interconnection, wicket operator, and belt drive generator.

This project is an energy recovery system for a municipal water pollution control facility in Ohio. ....read more.


450kW, NC

Year: 2010
Running Gear: 1 Kaplan and synchronous generator, 2 Propeller and belt drive induction generators, total 450 kW installed capacity
Scope: Mechanical design, controls, and switchgear

Click for more info and pictures.


100kW, VA

Year: 2009
Running Gear: Two Francis turbines with induction generators.
Scope: Mechanical design, controls, switchgear, wicket gate operators, automatic trashracks.

Click for more info and pictures.


225kW, NC

Year: 2008
Running Gear: One Francis turbine and vertical shaft synchronous generator.
Scope: Controls, switchgear, and wicket operator.

Click for more info and pictures.


Our Own Hydro, 2.2 MW, Central NC

Years: 2001-present        
Running Gear: 6 Generators, 2200 kW total installed capacity
Scope:  Complete development – control systems, mechanical, electrical, and civil design and construction.

The PHT manufacturing facility is powered by our own hydro plants....read more.